RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2001021503 - Archived data from Tue, 11. August 2020 17:46:59 CEST


This is all the information about APD 2001021503. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2001021503
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2001021503/2609029874
Unit: #1144 (barcode 1309012794)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 206
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6024668 V     T = -25 °C: 348.4218649 V
Voltage for Gain 150: T = +20 °C: 392.4296635 V     T = -25 °C: 355.9196329 V
Voltage for Gain 200: T = +20 °C: 396.7522345 V     T = -25 °C: 360.1561689 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.378203688 V-1     T = -25 °C: 4.721790322 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.58007699 V-1     T = -25 °C: 9.176806891 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.87783076 V-1     T = -25 °C: 14.4297646 V-1
Break-through voltage: T = +20 °C: 410.7977914 V     T = -25 °C: 374.4914172 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:54 CET jreher Updated box and position via API.
11. Aug 2020 17:46:59 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:10 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:11 CET jreher Updated box and position via API.
27. Nov 2019 20:05:32 CET jreher Updated APD location via API.
25. Nov 2019 17:27:05 CET jreher Updated box and position via API.
18. Nov 2019 18:19:25 CET spankonin Updated APD location via API.
18. Nov 2019 18:17:19 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:41 CEST Tobias Imported from Hamamatsu datasheet.