RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0717006695 - Archived data from Tue, 11. August 2020 17:57:05 CEST


This is all the information about APD 0717006695. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0717006695
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.5 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 78
Position in grid: 0
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 392.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.8388915 V     T = -25 °C: 356.8192686 V
Voltage for Gain 150: T = +20 °C: 400.738721 V     T = -25 °C: 364.326115 V
Voltage for Gain 200: T = +20 °C: 405.1216528 V     T = -25 °C: 368.5371634 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.59455602 V-1     T = -25 °C: 4.89216027 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.128404531 V-1     T = -25 °C: 8.997810048 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.20395694 V-1     T = -25 °C: 15.8679251 V-1
Break-through voltage: T = +20 °C: 419.6142084 V     T = -25 °C: 383.7725595 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:55 CET jreher Updated box and position via API.
11. Aug 2020 17:57:05 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:33 CEST jreher Updated box and position via API.
19. Dec 2019 15:52:00 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:45 CET jreher Updated box and position via API.
23. Aug 2017 15:53:23 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:11:33 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:55:57 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:50:11 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:13 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:17 CEST Tobias Imported from Hamamatsu datasheet.