RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1914021373 - Archived data from Tue, 11. August 2020 17:47:01 CEST


This is all the information about APD 1914021373. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1914021373
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2707030547/1914021373
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.7 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 208
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.8282103 V     T = -25 °C: 342.6521063 V
Voltage for Gain 150: T = +20 °C: 385.697518 V     T = -25 °C: 349.9344302 V
Voltage for Gain 200: T = +20 °C: 390.0729991 V     T = -25 °C: 354.0358086 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.661861074 V-1     T = -25 °C: 4.761207592 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.196050021 V-1     T = -25 °C: 9.647696224 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36292476 V-1     T = -25 °C: 15.26941454 V-1
Break-through voltage: T = +20 °C: 404.9758822 V     T = -25 °C: 368.8391075 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:06 CET jreher Updated box and position via API.
11. Aug 2020 17:47:01 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:47:29 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:20 CET jreher Updated box and position via API.
27. Nov 2019 20:05:52 CET jreher Updated APD location via API.
25. Nov 2019 17:27:11 CET jreher Updated box and position via API.
18. Nov 2019 18:19:42 CET spankonin Updated APD location via API.
18. Nov 2019 18:16:46 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:01 CEST Tobias Imported from Hamamatsu datasheet.