RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021292 - Archived data from Tue, 06. October 2020 16:52:46 CEST


This is all the information about APD 1913021292. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021292
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 375.8 V
Dark current: 9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 265
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.5415295 V     T = -25 °C: 341.4260717 V
Voltage for Gain 150: T = +20 °C: 384.4055603 V     T = -25 °C: 348.6928351 V
Voltage for Gain 200: T = +20 °C: 388.7675049 V     T = -25 °C: 352.8070385 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.394433702 V-1     T = -25 °C: 4.965856474 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.474000442 V-1     T = -25 °C: 9.538323935 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.5887856 V-1     T = -25 °C: 15.45810416 V-1
Break-through voltage: T = +20 °C: 404.2102926 V     T = -25 °C: 367.9166428 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:27 CET jreher Updated box and position via API.
29. Jan 2021 10:23:39 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:49:42 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:14 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:28 CET jreher Updated APD location via API.
25. Nov 2019 17:30:42 CET jreher Updated box and position via API.
25. Nov 2019 17:16:34 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:59 CEST Tobias Imported from Hamamatsu datasheet.