RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021263 - Archived data from Fri, 05. February 2021 11:23:15 CET


This is all the information about APD 1913021263. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021263
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.6 V
Dark current: 10.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 271
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1079919 V     T = -25 °C: 342.720943 V
Voltage for Gain 150: T = +20 °C: 385.9337724 V     T = -25 °C: 350.0323064 V
Voltage for Gain 200: T = +20 °C: 390.2913204 V     T = -25 °C: 354.1542953 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.5726933 V-1     T = -25 °C: 5.075099407 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.998638721 V-1     T = -25 °C: 9.442974581 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.96367607 V-1     T = -25 °C: 14.91010893 V-1
Break-through voltage: T = +20 °C: 405.9062988 V     T = -25 °C: 369.6136509 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:59:42 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:03:12 CEST jreher Updated box and position via API.
05. Feb 2021 11:23:15 CET jreher Updated box and position via API.
11. Aug 2020 17:49:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:36:23 CEST jreher Updated box and position via API.
27. Nov 2019 20:16:17 CET jreher Updated APD location via API.
25. Nov 2019 17:30:52 CET jreher Updated box and position via API.
25. Nov 2019 17:14:07 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:58 CEST Tobias Imported from Hamamatsu datasheet.