RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021222 - Archived data from Tue, 11. August 2020 17:49:15 CEST


This is all the information about APD 1912021222. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021222
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 11.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 257
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5464032 V     T = -25 °C: 344.9426327 V
Voltage for Gain 150: T = +20 °C: 388.4241264 V     T = -25 °C: 352.3143358 V
Voltage for Gain 200: T = +20 °C: 392.7916134 V     T = -25 °C: 356.4675895 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.414909128 V-1     T = -25 °C: 4.976543907 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.562956208 V-1     T = -25 °C: 9.135828748 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.81918105 V-1     T = -25 °C: 16.20804962 V-1
Break-through voltage: T = +20 °C: 407.3053018 V     T = -25 °C: 370.9258108 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:26 CET jreher Updated box and position via API.
07. Oct 2020 14:22:40 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:51 CEST jreher Updated box and position via API.
11. Aug 2020 17:49:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:48 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:20 CET jreher Updated APD location via API.
25. Nov 2019 17:30:24 CET jreher Updated box and position via API.
25. Nov 2019 17:19:58 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:57 CEST Tobias Imported from Hamamatsu datasheet.