RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021187 - Archived data from Mon, 17. August 2020 15:53:53 CEST


This is all the information about APD 1912021187. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021187
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 11.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 208
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7917493 V     T = -25 °C: 345.9894974 V
Voltage for Gain 150: T = +20 °C: 389.605815 V     T = -25 °C: 353.4555798 V
Voltage for Gain 200: T = +20 °C: 393.927984 V     T = -25 °C: 357.6635622 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.682070872 V-1     T = -25 °C: 5.117325332 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.373628078 V-1     T = -25 °C: 8.941721717 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.73975519 V-1     T = -25 °C: 15.62009229 V-1
Break-through voltage: T = +20 °C: 409.5093734 V     T = -25 °C: 373.4188489 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:05 CET jreher Updated box and position via API.
07. Oct 2020 14:22:37 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:53 CEST jreher Updated box and position via API.
11. Aug 2020 17:47:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:51 CET jreher Updated APD location via API.
25. Nov 2019 17:27:10 CET jreher Updated box and position via API.
18. Nov 2019 18:19:42 CET spankonin Updated APD location via API.
18. Nov 2019 18:17:19 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:56 CEST Tobias Imported from Hamamatsu datasheet.