RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021127 - Archived data from Tue, 11. August 2020 17:47:27 CEST


This is all the information about APD 1911021127. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021127
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 373.4 V
Dark current: 13.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 238
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.7716916 V     T = -25 °C: 339.9941233 V
Voltage for Gain 150: T = +20 °C: 382.6334758 V     T = -25 °C: 347.2405785 V
Voltage for Gain 200: T = +20 °C: 387.0159695 V     T = -25 °C: 351.3281186 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.70161737 V-1     T = -25 °C: 5.035399615 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.278871415 V-1     T = -25 °C: 9.393855616 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40653156 V-1     T = -25 °C: 14.82376703 V-1
Break-through voltage: T = +20 °C: 401.0740323 V     T = -25 °C: 365.1399433 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:19:01 CET jreher Updated box and position via API.
11. Aug 2020 17:47:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:41 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:14 CET jreher Updated APD location via API.
25. Nov 2019 17:29:24 CET jreher Updated box and position via API.
18. Nov 2019 18:20:36 CET spankonin Updated APD location via API.
18. Nov 2019 18:14:42 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:54 CEST Tobias Imported from Hamamatsu datasheet.