RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1911021105 - Archived data from Tue, 11. August 2020 17:47:30 CEST


This is all the information about APD 1911021105. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1911021105
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 16 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.724967 V     T = -25 °C: 346.0082733 V
Voltage for Gain 150: T = +20 °C: 389.5641147 V     T = -25 °C: 353.4487245 V
Voltage for Gain 200: T = +20 °C: 393.9097327 V     T = -25 °C: 357.6266601 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.70085731 V-1     T = -25 °C: 4.91595993 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.385014809 V-1     T = -25 °C: 8.961007331 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.71864287 V-1     T = -25 °C: 15.84900194 V-1
Break-through voltage: T = +20 °C: 409.299613 V     T = -25 °C: 373.0752128 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:05 CET jreher Updated box and position via API.
07. Oct 2020 15:44:03 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:30 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:49 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:22 CET jreher Updated APD location via API.
25. Nov 2019 17:29:26 CET jreher Updated box and position via API.
18. Nov 2019 18:20:56 CET spankonin Updated APD location via API.
18. Nov 2019 18:13:30 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:54 CEST Tobias Imported from Hamamatsu datasheet.