RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1908020891 - Archived data from Wed, 07. October 2020 12:19:31 CEST


This is all the information about APD 1908020891. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1908020891
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2303024384/1908020891
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.1 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 262
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7201714 V     T = -25 °C: 341.5186247 V
Voltage for Gain 150: T = +20 °C: 384.5855364 V     T = -25 °C: 348.8257472 V
Voltage for Gain 200: T = +20 °C: 388.9583148 V     T = -25 °C: 352.9315361 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.70074454 V-1     T = -25 °C: 4.802473113 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.328454396 V-1     T = -25 °C: 9.75063003 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.54656744 V-1     T = -25 °C: 15.53101428 V-1
Break-through voltage: T = +20 °C: 403.6483039 V     T = -25 °C: 367.5731802 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:04 CET jreher Updated box and position via API.
07. Oct 2020 12:19:31 CEST jreher Assigned to capsule by script
06. Oct 2020 16:52:57 CEST jreher Updated box and position via API.
11. Aug 2020 17:49:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:44 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:00 CET jreher Updated APD location via API.
25. Nov 2019 17:30:33 CET jreher Updated box and position via API.
25. Nov 2019 17:19:39 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:48:59 CEST Tobias Imported from Hamamatsu datasheet.