RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1908020873 - Archived data from Wed, 07. October 2020 15:44:06 CEST


This is all the information about APD 1908020873. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1908020873
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H05
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.8 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 246
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.5663062 V     T = -25 °C: 340.6631055 V
Voltage for Gain 150: T = +20 °C: 383.4249923 V     T = -25 °C: 347.913661 V
Voltage for Gain 200: T = +20 °C: 387.809674 V     T = -25 °C: 352.0000745 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.419904789 V-1     T = -25 °C: 4.780833877 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.560880242 V-1     T = -25 °C: 9.691410469 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.77816523 V-1     T = -25 °C: 15.42382782 V-1
Break-through voltage: T = +20 °C: 402.2904269 V     T = -25 °C: 366.4537107 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:55 CET jreher Updated box and position via API.
07. Oct 2020 15:44:06 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:07 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:48 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:28 CET jreher Updated APD location via API.
25. Nov 2019 17:33:18 CET jreher Updated box and position via API.
25. Nov 2019 15:26:06 CET spankonin Updated APD batch assignment via API.
21. Nov 2019 16:52:51 CET spankonin Updated APD location via API.
23. Jun 2016 11:48:59 CEST Tobias Imported from Hamamatsu datasheet.