RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1901020365 - Archived data from Tue, 11. August 2020 18:08:52 CEST


This is all the information about APD 1901020365. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1901020365
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 15.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 330
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0452075 V     T = -25 °C: 345.3613659 V
Voltage for Gain 150: T = +20 °C: 388.9451244 V     T = -25 °C: 352.7916171 V
Voltage for Gain 200: T = +20 °C: 393.3459695 V     T = -25 °C: 356.9646314 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.553891214 V-1     T = -25 °C: 4.755156906 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.905400256 V-1     T = -25 °C: 9.577606242 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.78752038 V-1     T = -25 °C: 15.12213587 V-1
Break-through voltage: T = +20 °C: 407.9250914 V     T = -25 °C: 371.4880144 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:08:06 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:30:44 CET jreher Updated box and position via API.
18. Dec 2020 14:00:54 CET jreher Updated box and position via API.
11. Aug 2020 18:08:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:46:22 CEST jreher Updated APD location via API.
21. Jul 2020 14:46:12 CEST jreher Updated box and position via API.
29. Jun 2020 16:08:27 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 11:48:46 CEST Tobias Imported from Hamamatsu datasheet.