RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1708019014 - Archived data from Fri, 05. February 2021 11:22:20 CET


This is all the information about APD 1708019014. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1708019014
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.5 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 264
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.9921373 V     T = -25 °C: 356.7401648 V
Voltage for Gain 150: T = +20 °C: 400.9258309 V     T = -25 °C: 364.5173762 V
Voltage for Gain 200: T = +20 °C: 405.3525278 V     T = -25 °C: 368.7472701 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.548384736 V-1     T = -25 °C: 4.161798282 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.897465896 V-1     T = -25 °C: 9.753503402 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.67985489 V-1     T = -25 °C: 14.13428837 V-1
Break-through voltage: T = +20 °C: 421.1327217 V     T = -25 °C: 384.5915449 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:52:48 CET oafedulidis Assigned to capsule by script
09. Dec 2021 13:11:02 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:22:20 CET jreher Updated box and position via API.
11. Aug 2020 17:50:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:04 CEST jreher Updated box and position via API.
03. Dec 2019 14:46:00 CET jreher Updated APD location via API.
02. Dec 2019 19:19:34 CET spankonin Updated box and position via API.
02. Dec 2019 19:11:31 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:25 CEST Tobias Imported from Hamamatsu datasheet.