RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1707018950 - Archived data from Tue, 11. August 2020 17:50:12 CEST


This is all the information about APD 1707018950. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1707018950
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.5 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 256
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.1591487 V     T = -25 °C: 352.7168987 V
Voltage for Gain 150: T = +20 °C: 396.9944211 V     T = -25 °C: 360.284106 V
Voltage for Gain 200: T = +20 °C: 401.3532632 V     T = -25 °C: 364.5469107 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.555756066 V-1     T = -25 °C: 4.874192592 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.010467856 V-1     T = -25 °C: 8.968711896 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.02126375 V-1     T = -25 °C: 15.70300632 V-1
Break-through voltage: T = +20 °C: 416.6781558 V     T = -25 °C: 380.3253223 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:19:06 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:15:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:14 CET jreher Updated box and position via API.
11. Aug 2020 17:50:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:33 CEST jreher Updated box and position via API.
03. Dec 2019 14:47:12 CET jreher Updated APD location via API.
02. Dec 2019 19:18:35 CET spankonin Updated box and position via API.
02. Dec 2019 19:15:24 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:24 CEST Tobias Imported from Hamamatsu datasheet.