RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1706018859 - Archived data from Thu, 16. December 2021 13:42:19 CET


This is all the information about APD 1706018859. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1706018859
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391.5 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 256
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.9323836 V     T = -25 °C: 354.6519519 V
Voltage for Gain 150: T = +20 °C: 398.8722893 V     T = -25 °C: 362.2517283 V
Voltage for Gain 200: T = +20 °C: 403.2911884 V     T = -25 °C: 366.5303206 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.540729851 V-1     T = -25 °C: 4.889693431 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.944313331 V-1     T = -25 °C: 8.944062306 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.80805157 V-1     T = -25 °C: 15.52292435 V-1
Break-through voltage: T = +20 °C: 417.9423204 V     T = -25 °C: 381.7981313 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:15:16 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:42:19 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:21:17 CET jreher Updated box and position via API.
11. Aug 2020 17:50:18 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:35 CEST jreher Updated box and position via API.
03. Dec 2019 14:47:14 CET jreher Updated APD location via API.
02. Dec 2019 19:18:37 CET spankonin Updated box and position via API.
02. Dec 2019 19:14:54 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:21 CEST Tobias Imported from Hamamatsu datasheet.