RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show submodule Testsubmodul 5-11-2013 16:30 - Archived data from Wed, 06. June 2018 11:47:04 CEST


This is all the information about the submodule Testsubmodul 5-11-2013 16:30. If it is wrong, edit the data.

Submodule specification:  
Serial: Testsubmodul 5-11-2013 16:30
Position: none
   
Location: unknown
Notes: Testsubmodul with 10 new VPTTs (Matching 16.05.18)
and 6 existing VPTTs (29.03.17)


Version history

Time Author Change comment
06. Dec 2018 17:55:57 CET cschnier swap location 2 times to set all crystal positions right
06. Dec 2018 17:55:38 CET cschnier swap location 2 times to set all crystal positions right
14. Sep 2018 14:58:10 CEST tobias Deleted old production number and position.
22. Aug 2018 16:55:51 CEST miriamk submodule has been disassembled
16. Aug 2018 12:24:27 CEST tobias Set location to Bonn.
09. Jul 2018 10:29:04 CEST cschnier Since 04.07.18 @ Bonn
07. Jun 2018 16:20:09 CEST cschnier used for test stand setup by Florens Grimm
06. Jun 2018 14:44:45 CEST cschnier
06. Jun 2018 11:47:04 CEST cschnier In Room NB2/32